Upgrading Oracle Grid Infrastructure in a production RAC environment requires more than following the standard installation procedure.

One of the key challenges is coordinating cluster node upgrades while maintaining database service availability and minimizing operational disruption.

With Oracle Grid Infrastructure 26ai, batch-based rolling upgrades provide an approach to upgrade cluster nodes in stages, rather than treating the entire cluster as a single upgrade operation.

In this technical walkthrough, I explore a practical four-node Oracle RAC scenario, divided into two upgrade batches, covering:

v  How batch-based rolling upgrades work.

v  The role of root user automation and `rootupgrade.sh`.

v  How RAC database instances are handled during individual node upgrades.

v  How to plan service relocation between upgrade batches.

v  Practical `gridSetup.sh -upgrade -batchInfo` command examples.

v  Pre-upgrade validation using CVU and installer dry-run mode.

v  Post-upgrade verification and handling unreachable cluster nodes.

 

The walkthrough also highlights important operational restrictions and considerations that should be understood before starting a production upgrade.

Ø    My objective is to go beyond documenting upgrade commands and focus on the operational decisions required to execute a controlled Grid Infrastructure upgrade.

 

The important distinction is that Oracle describes two execution approaches: using root automation to upgrade selected batches of nodes, or running root scripts manually, which upgrades the entire cluster rather than allowing individual nodes to be selected or deselected.

 

 1.    What does this mean in a real Oracle RAC environment?

Imagine a four-node RAC cluster:

 


All four nodes run the existing Grid Infrastructure version and host RAC instances.

For a 4-node Oracle RAC cluster upgrading Grid Infrastructure to 26ai, I would plan the work in two batches, with two nodes per batch, assuming Oracle supports that batch configuration for your specific source version and upgrade path.

The objective is to upgrade Grid Infrastructure in stages, move services where appropriate, and maintain database availability through the remaining RAC instances wherever the architecture permits.

 

Example: rolling upgrade in two batches


    

This illustrates the batching concept; actual batch sizes and service placement depend on the supported upgrade path and cluster design.

The purpose is to upgrade the cluster in stages instead of treating every node as one simultaneous maintenance operation.

 

 

Validate the first batch and arrange service placement before continuing.

Complete the remaining batch, then validate the entire cluster and its services (CVU pre-upgrade validation).

 

2. Why does Oracle recommend root user automation?

Root user automation allows you to:

  • Divide cluster nodes into upgrade batches.
  • Start upgrades for those batches.
  • Move services from nodes running the old version to upgraded nodes between batches.
  • Automate execution of rootupgrade.sh, including stopping and restarting instances as required.

Without root user automation, Oracle says you cannot select or deselect individual nodes for the upgrade in this manner; the upgrade applies to the entire cluster.

 

3. What happens to the RAC database instances?

Oracle recommends leaving RAC instances running while upgrading Oracle Clusterware. However, when the root upgrade script starts on an individual node, the database instance on that node is shut down, and rootupgrade.sh starts it again.

These two statements are not contradictory:

  • At cluster level: You do not need to manually shut down all RAC instances before beginning the upgrade.
  • At node level: The instance on a node undergoing its upgrade is shut down and restarted as part of that process.

The other nodes may continue serving workloads, provided the cluster has sufficient capacity and the application can use the remaining instances and services.

 

That does not guarantee zero downtime. Service placement, application connection handling, workload capacity, and the exact supported upgrade procedure all matter.

 

4. Why must you not add nodes during a rolling upgrade?

Note that Oracle does not support attempting to add additional nodes during a rolling upgrade.

For example, if you start with four nodes and plan to add a fifth node during the upgrade, do not combine that node-addition operation with the rolling upgrade. Complete the upgrade according to the supported procedure, then handle node expansion as a separate planned activity.

 

5. What should you do before the maintenance window?

A practical checklist derived from these restrictions is:

  1. Confirm the supported upgrade path and prerequisites.
  2. Validate storage, patches, and cluster readiness.
  3. Define the node batches and service relocation plan.
  4. Check application connectivity and the capacity of the nodes that will remain available.
  5. Decide whether to use root user automation and validate the execution procedure.
  6. Establish post-upgrade checks for cluster resources, RAC instances, services, and application connectivity.

The key operational lesson: Rolling upgrades reduce the need to upgrade the entire cluster at once, but they do not eliminate instance restarts or automatically guarantee application continuity. The upgrade sequence and service placement must be designed around the workload.

 

Step-by-step procedure for 4-Node RAC (Upgrading 19c to 26ai)

The following is a planning runbook, not a copy-paste-ready production procedure. Exact commands and batch selection depend on the source Grid Infrastructure release, OS, and supported upgrade path.

 

Phase 1: Pre-upgrade preparation

Step 1. Establish the current state on all four nodes.

As the Grid owner, check the current cluster and ASM status:

olsnodes -n

crsctl check cluster -all

crsctl stat res -t

srvctl status database -d <DB_UNIQUE_NAME>

asmcmd lsdg

Record the existing Grid home, database homes, services, ASM disk groups, and current resource placement.

 

Step 2. Validate prerequisites.

  • Confirm the supported upgrade path to 26ai.
  • Check mandatory patches and run CVU pre-upgrade validation.
  • Verify OCR and voting-file storage locations.
  • Plan the migration away from ASMFD if configured.
  • Address GIMR removal if configured.
  • Confirm backups and a documented recovery procedure.

 

Step 3. Prepare the new Grid home on the cluster nodes.

Extract the 26ai Grid Infrastructure image into the intended new Grid home. Confirm ownership, permissions, available space, and required configuration consistency.

Grid Infrastructure upgrades are out-of-place; do not overwrite the existing Grid home.

mkdir -p /u01/app/23.0.0/grid

chown grid:oinstall /u01/app/23.0.0/grid

cd /u01/app/23.0.0/grid

unzip -q download_location/grid_home.zip

You can verify that the permissions required for installing Oracle Clusterware has been configured on the nodes node1 and node2 by running a command similar to the following (Upgrading 19c to 26ai).

$ /u01/app/23.0.0/grid/runcluvfy.sh stage  -pre crsinst  \

 -upgrade  -rolling   \

-src_crshome /u01/app/19.0.0/grid  \

-dest_crshome /u01/app/23.0.0/grid  \

 -dest_version 23.0.0.0.0  \

 -fixup -verbose

Oracle Grid Infrastructure dry-run upgrade mode enables you to check system readiness for upgrade.

Ø  Starting with Oracle Grid Infrastructure 19c, the Oracle Grid Infrastructure installer enables you to perform a dry-run upgrade to check readiness of the system for upgrade. To perform Oracle Grid Infrastructure dry-run upgrade, create a new Grid home with the necessary user group permissions, extract the Oracle Grid Infrastructure 26ai gold image to the new Grid home, and then start the installer with, dryRunForUpgrade flag.

Dry-run upgrades are not supported on Oracle Grid Infrastructure for a standalone server (Oracle Restart) configuration.

Note: The installer does not perform an actual upgrade in the dry-run upgrade mode. You can relaunch the installer, without any flag, from any of the cluster nodes to upgrade Oracle Grid Infrastructure if dry-run is successful.

The installer performs the following tasks in dry-run upgrade mode:

  • Validates storage and network configuration for the new release
  • Checks if the system meets the software and hardware requirements for the new release
  • Checks for the patch requirements and apply necessary patches before starting the upgrade
  • Writes system configuration issues or errors in the gridSetupActions<timestamp>.log log file

 

The Grid infrastructure dry-run upgrade flow is similar to a regular upgrade, but the installer does not run any configuration tool.


Step 4. Run the dry-run upgrade.

Use the documented installer workflow:

$ /u01/app/23.0.0/grid/gridSetup.sh  -dryRunForUpgrade

Review the installer logs and resolve reported issues before the actual upgrade. Oracle recommends configuring root script automation during this preparation.

 

Phase 2: Execute the rolling upgrade

Step 5. Define the batches.

For example, if your supported upgrade procedure permits two batches:

Batch

Nodes

Action

1

Node 1, Node 2

Upgrade first

2

Node 3, Node 4

Upgrade after the first batch

 

The node where you run Oracle Universal Installer must belong to Batch 1.

Oracle permits up to three batches.

 

Four-node example: two nodes per batch

Assume your cluster has these hostnames:

Node

Batch

rac01 ; local node running gridSetup.sh

1

rac02

1

rac03

2

rac04

2

 

The batch-map format shown in Oracle response-file templates is a comma-separated list of node:batch pairs.

Applying that format to this example gives:

rac01:1, rac02:1, rac03:2, rac04:2

The corresponding command would be:

cd /u01/app/26.0.0/grid

./gridSetup.sh -upgrade \

  -ORACLE_BASE /u01/app/grid   -batchInfo rac01:1, rac02:1, rac03:2, rac04:2   -executePrereqs

 

./gridSetup.sh -upgrade   -ORACLE_BASE /u01/app/grid \

  -batchInfo rac01:1,rac02:1,rac03:2,rac04:2   -dryRun

 

$NEW_GRID_HOME/gridSetup.sh   -upgrade   -ORACLE_BASE /u01/app/grid   \

-batchInfo  rac01:1,rac02:1,rac03:2,rac04:2  

  -executeConfigTools   \

-executeRootScript 

 -configMethod ROOT

 

How the batches work

  • Batch 1: rac01 and rac02 are assigned to the first upgrade batch.
  • Batch 2: rac03 and rac04 are assigned to the second batch.
  • The local node, rac01, must be in Batch 1.
  • With root script automation configured, the installer can pause between batches so services can be relocated before continuing.

Do not assume that specifying -batchInfo alone completes the upgrade or guarantees service continuity. Follow the installer prompts and the documented root-script/configuration workflow.

One final recommendation: inspect the response-file template shipped with your actual 26ai installation image for the batchInfo description and examples. That is the best way to confirm the expected mapping format for the exact installer you will run.

 

Step 6. Start the actual upgrade.

Run the upgrade using the supported OUI workflow or the documented gridSetup.sh -upgrade options. The -batchInfo option specifies the cluster-node batch map; use the exact syntax and mapping required by the 26ai installer for your environment.

Ø  Do not assume that running the installer once automatically means both batches have completed.

Relaunch the installer from the same Grid home without any flag to start an actual upgrade.

cd /u01/app/23.0.0/grid

$ /u01/app/23.0.0/grid/gridSetup.sh -upgrade -ORACLE_BASE /u01/app/grid [-ignoreDownNodes]                                -executeConfigTools  -executeRootScript  -configMethod ROOT

Provide the root user password when prompted.

Because the Oracle Grid Infrastructure home is in a different location than the former Oracle Clusterware and Oracle ASM homes, update any scripts or applications that use utilities, libraries, or other files that reside in the Oracle Clusterware and Oracle ASM homes.

 

Note: If you need to apply patches before performing the upgrade, then use the OPatch utility to apply    in-place patches on each cluster node.

 

Step 7. Execute the root upgrade script for Batch 1.

Follow the installer’s instructions and use root user automation where supported. The upgrade script stops and restarts the database instance on the node being processed.

Verify that the first batch has completed successfully before proceeding.

 

Step 8. Validate and manage services between batches.

Check the cluster resources, database instances, service placement, and application connectivity. Relocate services where required by your plan, ensuring that the remaining nodes have sufficient capacity.

  

Step 9. Upgrade Batch 2.

Proceed only when the upgrade workflow permits it and Batch 1 has reached the required state. Execute the root upgrade operations as directed by the installer.

 

Phase 3: Post-upgrade validation

Step 10. Confirm the final cluster state.

Check:

crsctl check cluster -all

crsctl stat res -t

srvctl status database -d <DB_UNIQUE_NAME>

srvctl status service -d <DB_UNIQUE_NAME>

Also verify ASM disk groups, OCR and voting files, database connectivity, service failover behavior, and the relevant installer and upgrade logs.

 

Step 11. Complete required post-upgrade tasks.

Review the 26ai documentation for any required changes to OCR backup locations, configuration entries, and scripts that reference the old Grid home. Retain the previous home until the upgrade has been validated and the applicable retention and recovery requirements have been satisfied.

Important: The 2+2 layout above is an example, not a guarantee that this batch plan is supported for every source release or configuration. Before using it in production, confirm the exact upgrade path and batch restrictions for your environment based on official Oracle docs.

 

Completing an Oracle Clusterware Upgrade when Nodes Become Unreachable

If some nodes become unreachable in the middle of an upgrade, then you cannot complete the upgrade, because the upgrade script (rootupgrade.sh) did not run on the unreachable nodes. Because the upgrade is incomplete, Oracle Clusterware remains in the previous release.

 

  1. Confirm that the upgrade is incomplete by entering the following command:

$ crsctl query crs activeversion

The active release should be the source release.

  1. To resolve this problem, run the rootupgrade.sh command with the -force flag using the following syntax:

$Grid_home/rootupgrade  -force

 

For example:

# /u01/app/23.0.0/grid/rootupgrade  -force

This command forces the upgrade to complete. The force cluster upgrade has the following limitations:

    • All active nodes must be upgraded to the newer release.
    • All inactive nodes (accessible or inaccessible) may be either upgraded or not upgraded.
    • For inaccessible nodes, after patch set upgrades, you can delete the node from the cluster. If the node becomes accessible later, and the patch version upgrade path is supported, then you can upgrade it to the new patch version.
  1. Verify that the upgrade has completed by using the following command:

 # Verify ASM version

$ sqlplus / as sysasm

SQL> SELECT banner_full FROM v$version;

 

# Verify CRS active version & state

$ crsctl query crs activeversion -f

$ crsctl query crs softwareversion

 

# Repeat on remaing Nodes.

 

Oracle Clusterware active version on the cluster is [23.0.0.0.0]. Cluster upgrade state: NORMAL.

The cluster upgrade state is [FORCED]. The cluster active patch level is [0].

The active release should be the upgraded release.

 

  

The upgrade state FORCED indicates that Oracle Clusterware upgrade was completed forcibly on all reachable nodes, while one or more cluster nodes were unreachable. You can either upgrade or delete the unreachable cluster nodes to change the cluster upgrade state from FORCED to NORMAL.

 So, rolling upgrades do not automatically guarantee zero downtime. Service placement, application connectivity, cluster capacity, and upgrade sequencing must all be considered as part of the implementation plan.

 

Appendix:

Root-user automation script

The following is a root-run orchestration wrapper for Oracle Grid Infrastructure 26ai. It performs basic checks and launches the installer as grid, with Oracle’s root-script automation options enabled.

Save as /root/run_gi_upgrade.sh:

#!/bin/bash

set -Eeuo pipefail


# Run this wrapper as root.

if [[ $EUID -ne 0 ]]; then

    echo "ERROR: Run this script as root."

    exit 1

fi


# Adjust these paths for your environment.

GRID_USER="grid"

GRID_HOME="/u01/app/26.0.0.0/grid"

ORACLE_BASE="/u01/app/grid"

BATCH_MAP="/u01/app/26.0.0.0/grid/batch_map"


LOG_DIR="/var/log/gi_upgrade"

LOG_FILE="${LOG_DIR}/gridSetup_upgrade_$(date +%Y%m%d_%H%M%S).log"


mkdir -p "$LOG_DIR"

chmod 750 "$LOG_DIR"


# Validate required files.

for file in "${GRID_HOME}/gridSetup.sh" "$BATCH_MAP"; do

    if [[ ! -r "$file" ]]; then

        echo "ERROR: Required file is missing or unreadable: $file"

        exit 1

    fi

done


# Ensure the Grid owner exists.

id "$GRID_USER" >/dev/null 2>&1 || {

    echo "ERROR: User $GRID_USER does not exist."

    exit 1

}


echo "Starting GI upgrade preparation at $(date)"

echo "Grid home: $GRID_HOME"

echo "Batch map: $BATCH_MAP"

echo "Log file:  $LOG_FILE"


# Run installer as the Grid Infrastructure owner.

# Oracle root-script automation is enabled through the documented flags.

runuser -u "$GRID_USER" -- \

    "$GRID_HOME/gridSetup.sh" \

    -upgrade \

    -ORACLE_BASE "$ORACLE_BASE" \

    -batchInfo "$BATCH_MAP" \

    -executePrereqs \

    -executeRootScript \

    -configMethod ROOT \

    2>&1 | tee -a "$LOG_FILE"


rc=${PIPESTATUS[0]}


if [[ $rc -ne 0 ]]; then

    echo "ERROR: gridSetup.sh failed with exit code $rc"

    exit "$rc"

fi


echo "gridSetup.sh completed successfully at $(date)"

Make it executable and run it:

chmod 750 /root/run_gi_upgrade.sh

/root/run_gi_upgrade.sh

Oracle documents -executeRootScript -configMethod ROOT as supported upgrade options.





References:

https://docs.oracle.com/en/database/oracle/oracle-database/26/cwlin/gridsetup-upgradegridinfrastructure-command.html

https://docs.oracle.com/en/database/oracle/oracle-database/26/cwlin/upgrading-oracle-grid-infrastructure.html

 

 

************ Alireza Kamrani ************

No comments:

Post a Comment

How to perform a rolling upgrade in batches for Grid 26ai

How to perform a rolling upgrade in batches, using root user automation, while managing services across upgraded and non-upgraded nodes Upgr...